Gantry Crane for Shield Tunneling Machine
Product Name: Gantry Crane for Shield Tunneling Machine
Lifting capacity: 400t, 100t, 130t, 100+100t
Span: 18~36m Lifting height: 33~40m
This gantry crane is used for lifting of the cutter and shield body of underground non excavation shield tunneling machine and the tunnel support segment in the process of the construction.
E-Mail:craneweihua@126.com
- Description
- Specification
Weihua crane,This gantry crane is used for lifting of the cutter and shield body of underground non excavation shield tunneling machine and the tunnel support segment in the process of the construction. The rotating upper spreader adapts to the demand of different digging direction with flexible operation, perfect safety instructions and overload protection device system.
Features:
1. Spreader with 360° rotation is fit for installation of cutter from different angles;
2. Double trolley mechanism is applied for lifting cutter by double trolley or lifting duct piece by single trolley;
2. The temperature of the working environments is -20 ~ +45 degrees and.the Max relative humidity shall be less than 95%( with condensation);
3. Wind speed shall be less than 20m/s;
4. Working leave: A3, A4;
5. Special requests are available;
Lifting capacity |
t |
400 |
|
|
|
|||||
Working level |
A3 |
|
|
|
||||||
Span |
m |
33 |
34 |
|
|
|
||||
Lifting height |
Main lifting |
m |
24(up rail) /23(under rail) |
24(up rail) /23(under rail) |
|
|
|
|||
Deputy lifting |
22(up rail) /26(under rail) |
22(up rail) /26(under rail) |
|
|
|
|||||
Speed |
Main lifting |
m/min |
0.09~0.9 |
0.09~0.9 |
|
|
|
|||
Deputy lifting |
7 |
7 |
|
|
|
|||||
Crane travelling |
1.6~16 |
1.6~16 |
|
|
|
|||||
Crab travelling |
1.15~11.5 |
1.15~11.5 |
|
|
|
|||||
Dimensions |
L1 |
mm |
2500 |
|
|
|
||||
L2 |
3500 |
|
|
|
||||||
H1 |
3196 |
|
|
|
||||||
H2 |
22000 |
|
|
|
||||||
B |
14000 |
|
|
|
||||||
B1 |
22800 |
|
|
|
||||||
b1 |
1920 |
|
|
|
||||||
b2 |
1250 |
|
|
|
||||||
W |
4500 |
|
|
|
||||||
D |
6000 |
|
|
|
||||||
Max. wheel load |
KN |
406 |
415 |
|
|
|
||||
Rail recommended |
QU100 |
|
|
|
||||||
Power |
Three-phase AC 50Hz 380V |
|
|
|
||||||
Spreader rotation angle |
° |
±90° |
|
|
|
|||||
Cutter diameter |
m |
15 |
|
|
|
|||||
|
||||||||||
Lifting capacity |
Main lifting |
t |
200+200 |
|
|
|
||||
Deputy lifting |
10 |
|
|
|
||||||
Span |
m |
33 |
34 |
|
|
|
||||
Lifting height |
24+24(up rail) 24,under rail24) |
|
|
|
||||||
Work level |
A4 |
|
|
|
||||||
Speed |
Main lifting |
m/min |
0.09~0.9 |
|
|
|
||||
Aux.lifting |
7 |
|
|
|
||||||
Crane travelling |
1.15~11.5 |
|
|
|
||||||
Crab travelling |
1.6~16 |
|
|
|
||||||
Limit dimension |
L1 |
mm |
1920 |
|
|
|
||||
L2 |
1250 |
|
|
|
||||||
L |
6000 |
|
|
|
||||||
C1 |
2500 |
|
|
|
||||||
C2 |
3500 |
|
|
|
||||||
Main dimension |
H |
32040 |
|
|
|
|||||
H1 |
3200 |
|
|
|
||||||
H2 |
21800 |
|
|
|
||||||
H3 |
650 |
|
|
|
||||||
B |
22800 |
|
|
|
||||||
W |
14000 |
|
|
|
||||||
K |
4500 |
|
|
|
||||||
D |
15000 |
|
|
|
||||||
Max. wheel loading |
KN |
405 |
410 |
|
|
|
||||
Total power |
KW |
241 |
|
|
|
|||||
Crane rail recommended |
QU100 |
|
|
|
||||||
Power |
Three-phase AC 50Hz 380V |
|
|
|
||||||
|
||||||||||
Lifting capacity |
t |
100+100 |
|
|
|
|||||
Weihua crane,This gantry crane is used for lifting of the cutter and shield body of underground non excavation shield tunneling machine and the tunnel support segment in the process of the construction. The rotating upper spreader adapts to the demand of different digging direction with flexible operation, perfect safety instructions and overload protection device system.
Features:
1. Spreader with 360° rotation is fit for installation of cutter from different angles;
2. Double trolley mechanism is applied for lifting cutter by double trolley or lifting duct piece by single trolley;
2. The temperature of the working environments is -20 ~ +45 degrees and.the Max relative humidity shall be less than 95%( with condensation);
3. Wind speed shall be less than 20m/s;
4. Working leave: A3, A4;
5. Special requests are available;
Lifting capacity |
t |
400 |
|
|
|
|||||
Working level |
A3 |
|
|
|
||||||
Span |
m |
33 |
34 |
|
|
|
||||
Lifting height |
Main lifting |
m |
24(up rail) /23(under rail) |
24(up rail) /23(under rail) |
|
|
|
|||
Deputy lifting |
22(up rail) /26(under rail) |
22(up rail) /26(under rail) |
|
|
|
|||||
Speed |
Main lifting |
m/min |
0.09~0.9 |
0.09~0.9 |
|
|
|
|||
Deputy lifting |
7 |
7 |
|
|
|
|||||
Crane travelling |
1.6~16 |
1.6~16 |
|
|
|
|||||
Crab travelling |
1.15~11.5 |
1.15~11.5 |
|
|
|
|||||
Dimensions |
L1 |
mm |
2500 |
|
|
|
||||
L2 |
3500 |
|
|
|
||||||
H1 |
3196 |
|
|
|
||||||
H2 |
22000 |
|
|
|
||||||
B |
14000 |
|
|
|
||||||
B1 |
22800 |
|
|
|
||||||
b1 |
1920 |
|
|
|
||||||
b2 |
1250 |
|
|
|
||||||
W |
4500 |
|
|
|
||||||
D |
6000 |
|
|
|
||||||
Max. wheel load |
KN |
406 |
415 |
|
|
|
||||
Rail recommended |
QU100 |
|
|
|
||||||
Power |
Three-phase AC 50Hz 380V |
|
|
|
||||||
Spreader rotation angle |
° |
±90° |
|
|
|
|||||
Cutter diameter |
m |
15 |
|
|
|
|||||
|
||||||||||
Lifting capacity |
Main lifting |
t |
200+200 |
|
|
|
||||
Deputy lifting |
10 |
|
|
|
||||||
Span |
m |
33 |
34 |
|
|
|
||||
Lifting height |
24+24(up rail) 24,under rail24) |
|
|
|
||||||
Work level |
A4 |
|
|
|
||||||
Speed |
Main lifting |
m/min |
0.09~0.9 |
|
|
|
||||
Aux.lifting |
7 |
|
|
|
||||||
Crane travelling |
1.15~11.5 |
|
|
|
||||||
Crab travelling |
1.6~16 |
|
|
|
||||||
Limit dimension |
L1 |
mm |
1920 |
|
|
|
||||
L2 |
1250 |
|
|
|
||||||
L |
6000 |
|
|
|
||||||
C1 |
2500 |
|
|
|
||||||
C2 |
3500 |
|
|
|
||||||
Main dimension |
H |
32040 |
|
|
|
|||||
H1 |
3200 |
|
|
|
||||||
H2 |
21800 |
|
|
|
||||||
H3 |
650 |
|
|
|
||||||
B |
22800 |
|
|
|
||||||
W |
14000 |
|
|
|
||||||
K |
4500 |
|
|
|
||||||
D |
15000 |
|
|
|
||||||
Max. wheel loading |
KN |
405 |
410 |
|
|
|
||||
Total power |
KW |
241 |
|
|
|
|||||
Crane rail recommended |
QU100 |
|
|
|
||||||
Power |
Three-phase AC 50Hz 380V |
|
|
|
||||||
|
||||||||||
Lifting capacity |
t |
100+100 |
|
|
|
|||||
Span |
m |
33 |
34 |
|